Hazaribag civic body plans to make 200-tonne waste processing plant functional by Jan 26 | Ranchi News


Hazaribag civic body plans to make 200-tonne waste processing plant functional by Jan 26
Municipal commissioner Om Prakash Gupta has directed officials and agencies to complete ongoing projects within stipulated deadlines

Hazaribag: The Hazaribag Municipal Corporation is preparing to operationalise a 200 tonnes per day solid waste processing plant at Mandi by Jan 26 as part of efforts to tackle the city’s mounting waste disposal problem.The civic body has also planned measures to strengthen garbage collection, clean water bodies, process organic waste and explore energy generation from market waste.Municipal commissioner Om Prakash Gupta has directed officials and agencies to complete ongoing projects within stipulated deadlines. “Foundation work for the processing plant has been completed and machinery installation is underway,” Gupta said.A sanitary landfill facility is also being constructed to scientifically dispose of non-recyclable waste left after processing. “The waste will be compacted and covered with soil, with safeguards to prevent contamination of soil and groundwater,” Gupta said.The door-to-door garbage collection agency, Gurudas Construction, has been directed to ensure regular waste collection, repair damaged vehicles promptly and comply with minimum-wage norms.To strengthen monitoring and bring transparency to user charge collection, radio frequency identification (RFID) devices will be installed across all municipal wards from Monday. “The system would allow the corporation to better monitor door-to-door waste collection,” Gupta said.The corporation also plans to remove water hyacinth from the lake behind the amphitheatre using a weed harvester.In another initiative, the civic body is exploring the possibility of producing biogas from fruit and vegetable waste generated at Daily and Kalibari markets. Following inspections of the two markets, officials have been asked to assess the quantity and nature of biodegradable waste and prepare a proposal.Gupta also directed the engineering wing to repair potholes on major roads as a priority to prevent accidents and improve traffic movement. At Kalibari market, roadside vendors and vegetable sellers were asked to shift to designated spaces to ease congestion.



Source link

Leave a Reply

Your email address will not be published. Required fields are marked *