Western Railway undertakes overnight blocks for Metro-Line 6 work, foot overbridges in Mumbai | Mumbai News


Western Railway undertakes overnight blocks for Metro-Line 6 work, foot overbridges in Mumbai

MUMBAI: Western Railway carried out two major blocks on its suburban section during the night between Saturday and Sunday for infrastructure work, including the launching of steel girders for Metro Line-6 between Ram Mandir and Jogeshwari, and the installation of girders for two foot overbridges at Dahisar. WR Chief Spokesperson Vineet Abhishek said a block was undertaken between Ram Mandir and Jogeshwari for launching steel girders of Metro Line-6. As part of this, work was carried out on the sixth line for 10 hours until Sunday morning. During the block, all trains on the sixth line were diverted to the UP fast line between Borivali and Andheri. At the same time, another major block was carried out at Dahisar for the launching of girders for two foot overbridges. The block at Dahisar was implemented on the Down slow, Up slow and Down fast lines from 2:05 am to 4:05 am on Sunday, and on the Up fast line from 2:05 am to 3:05 am.



Source link

Leave a Reply

Your email address will not be published. Required fields are marked *